High and Low Voltage design, Load Flow Studies, Power and Control System Design and Development, Earthing Studies, PLC and SCADA Programming, MCC Design, Soft Starter and VSDs, Hazardous Area Electrical Design, Transient Motor Start, Harmonic Analysis, Protection Grading Studies,
Electrical Engineering Design, Documentation, and Contract Administration of all electrical works for New Newcastle Agri Terminal - Works include full High Voltage Design, low Voltage.
The $30M Newcastle Agri Terminal (NAT), the city’s second grain export facility and the first major grain port built in NSW for 25 years.
After payment has been processed, you will be contacted by an EPA representative to arrange your designs.