Design and documentation of the NBN Pit & Pipe or Pathway network for the proposed development using the current assisted NBN drafting tools.
The Pit & Pipe or Pathway Design will comply with the current standards and guidelines including NBN-TE-CTO-194 (New Developments: Deployment of the NBN Conduit and Pit Networks) and NBN-TE-CTO-284 (Building Design Guide - New Developments).
We have allowed to liaise with the NBN representatives as required.
For the undertaking of the electrical consulting portion of the project we propose the following scope of works.
Report EV Ready - Section 7.03.02 Part F of the DCP:
A proficient Electrical Engineer will prepare a report that outlines the development's compliance with Section 7.03.02 Part F of the DCP in terms of EV readiness. This report will entail an accurate electrical plan, specifications for off-street car parking, and any necessary electric kiosk requirements.
We have not allowed for ASP3 Design.
Order an EV Charging Readiness Report to comply with your local council DCP, DA or CC. LGAs include: Canada Bay, Cumberland, Lane Cove, Newcastle, Waverley, and Willoughby—with more councils expected to follow suit!
After payment has been processed, you will be contacted by an EPA representative to arrange your designs.